                                                                                           MARK CHURCH
EF-64-RWC-R00-1218-41000793-1                                                              Assessor - County Clerk - Recorder
BOE-64-RWC (P1) REV. 00 (12-18)                                                            555 County Center
                                                                                           Redwood City, CA 94063
INITIAL PURCHASER                                                                          P 650.363.4500    F 650.599.7435
CLAIM FOR RAIN WATER CAPTURE SYSTEM                                                        email assessor@smcacre.org
NEW CONSTRUCTION EXCLUSION                                                                 web www.smcacre.org
California law provides that under certain circumstances the initial 
purchaser of a building with a rain water capture system may qualify 
for a reduction in the assessed value of the property. In order to 
qualify for this reduction, this claim form must be completed and 
signed by the buyer and filed with the Assessor. Please refer to the 
General Information section for details.

        NAME AND MAILING ADDRESS 
        (Make necessary corrections to the printed name and mailing address.)

CLAIMANT NAME (LAST, FIRST, MIDDLE INITIAL)

ADDRESS                                                                      CITY                                    STATE ZIP

EMAIL ADDRESS                                                                                               DAYTIME TELEPHONE NUMBER
                                                                                                            ( )
ASSESSORS PARCEL NUMBER                                                      PURCHASE DATE                  INSTALLATION DATE

                                            Check and complete the following:
                                           P

1. $                       What is the value attributable to the rain water capture system included in the purchase price of the new building?   
                           Attach  a  copy of any documents necessary to identify the type and value of the rain water capture system 
                           included in the purchase price.

2. $                       What is the amount of any rebate for the rain water capture system provided to either the owner-builder or you?  
                           (See General Information) 

BUILDER NAME                                                                               TITLE

ADDRESS                                                                      CITY                                    STATE ZIP

EMAIL ADDRESS                                                                                               DAYTIME TELEPHONE NUMBER
                                                                                                            ( )

                                                     CERTIFICATION
   I certify (or declare) that the foregoing and all information hereon, including any accompanying statements or documents, is true, correct 
                                           and complete to the best of my knowledge and belief.
SIGNATURE  OF CLAIMANT                                                                                      DATE
u

                                           THIS DOCUMENT IS SUBJECT TO PUBLIC INSPECTION



- 2 -
EF-64-RWC-R00-1218-41000793-2
BOE-64-RWC (P2) REV. 00 (12-18)

                                                 GENERAL INFORMATION

Revenue and Taxation Code section 74.8 states, in part:

(b)For purposes of this section, “rain water capture system” means a facility designed to capture, retain, and store rain water flowing off
a building rooftop or other manmade aboveground hard surface for subsequent onsite use.

(c)(1) Notwithstanding any other law, for purposes of this section, “the construction or addition of a rain water capture system” includes
the construction of a rain water capture system incorporated by the owner-builder in the initial construction of a new building that 
the owner-builder does not intend to occupy or use.

(2)The exclusion provided by this section applies to the initial purchaser who purchased the new building from the owner-builder only if
the owner-builder did not receive an exclusion pursuant to this section for the same rain water capture system and only if the initial
purchaser purchased the new building prior to that building become subject to reassessment to the owner-builder, as described in
subdivision (d) of Section 75.12.

(d)This section shall be administered as follows:

(1)The initial purchaser of the new building shall file a claim with the assessor and provide to the assessor any documents necessary
to identify the value attributable to the rain water capture system included in the purchase price of the new building. The claim shall
also identify the amount of any rebate for the rain water capture system provided to either the owner-builder or the initial purchaser.

(2)The assessor shall evaluate the claim and determine the portion of the purchase price that is attributable to the rain water capture
system. The assessor shall then reduce the new base year value established as a result of the change in ownership of the new
building by an amount equal to the difference between the following two amounts:

(A)That portion of the value of the new building attributable to the rain water capture system.

(B) The total amount of all rebates, if any, described in paragraph (1) that were provided to either the owner-builder or the
initial purchaser.

(3)The extension of the new construction exclusion to the initial purchaser of a new constructed new building shall remain in effect only
until there is a subsequent change in ownership of the new building.

(e)This section applies to new construction completed on or after January 1, 2019.

(f)This section shall remain in effect only until January 1, 2029, and as of that date is repealed.