PDF document
- 1 -

Enlarge image
                                                                                   Print Form            Reset Form

1350

                                  STATE OF SOUTH CAROLINA
                                DEPARTMENT OF REVENUE                                                    PT-300X 
                                        SCHEDULE X                                 2025                  (Rev. 6/23/23) 
dor.sc.gov                       IMPROVEMENT SCHEDULE                                                    7057

                                        Owner name                                            SID number

Enter the breakdown of improvements for each plant/operation, reporting only investments not previously reported. Enter 
the schedule letter, schedule number, and plant/operation name associated with the improvements. A separate Schedule 
X is required for each plant/operation and should be attached to the associated plant/operation schedule.

Schedule letter Schedule number                                   Plant/Operation name

REAL PROPERTY IMPROVEMENTS
Gross cost
                1. Change in square footage
                2. Interior renovations/repair
                3. Roof repair/replacement
                4. Site/yard improvements
                5. Tanks
                6. Other (specify)

LEASEHOLD IMPROVEMENTS
Gross cost
                1. Change in square footage
                2. Interior renovations/repair
                3. Roof repair/replacement
                4. Heating and air conditioning
                5. Sprinklers
                6. Lighting
                7. Site/yard improvements
                8. Tanks
                9. Other (specify)

POLLUTION CONTROL IMPROVEMENTS
Attach an itemized detailed list identifying all new pollution control investments.
Only investments required by state or federal governments qualify.

PERSONAL PROPERTY POLLUTION
Gross cost

                1. All personal property

REAL PROPERTY POLLUTION
Gross cost
                1. Land
                2. Building
                3. Site/yard improvements
                4. Sedimentation ponds
                5. Dykes/retention ponds
                6. Other (specify)

70571252






PDF file checksum: 112179424

(Plugin #1/9.12/13.0)